To order and sequence our PRE-PRODUCTION DELIVERABLES,
drag and drop the puzzle pieces to the blue framed canvas.
Build the puzzle in less than 3 min to get a bonus star
TIPS:
We usually start scoping at the FEATURE level, then, we breakdown the work into TASKS.
It is called a WBS: Work Breakdown Structure.
One of the goals during Pre-Production is to build a schedule or Gantt Chart to plan the Production phase.
Last, the team really enjoyed the KANBAN we built in Conception. Let's also build one for the First Publishable tasks.
Stopwatch: 03:00


Turns: 0